• 2014 год

“172 Central auto repair plant”, Voronezh

 

At the moment the second stage of the construction of CHP is developing.
At the first stage two power-generating units were fabricated and installed, with output power of 404 kW each.
At the second stage another power unit with output power of 404 kW will be built.

As a result, in 2014 at “172 Central Auto Repair Plant” will be commissioned mini-CHP based on engines MAN E2842 LE202, with total output power:
1012 kW – electric;
1374 kW – thermal.